DTEK — latest ecology news
At the same time, repair work is ongoing, so there may be restrictions in case of increased load
556.4 MW of green generation capacities are connected to networks in the Odesa region
The largest number of capacities was connected in the Odesa region – 65.9 MW
The wind farm will reduce annual carbon emissions by 1.7 million tons
Preparatory work will continue until May 2024
The company is building 1,500 MW of green power in four EU countries
Currently, the SES generates 3 MW
DTEK is looking for investors for the construction of the second phase of Tyligul wind farm
In 2021, the net profit of "DTEK VDE" reached UAH 4.44 billion
Also Mykolaiv region received more than 20 mobile wind turbines from partners
The old socket fell and damaged the electrical lines
Trifonivska SES was occupied by the Russian army for 7 months