The waste processing plant in Lviv is planned to be completed by the end of 2023

The waste processing plant in Lviv is planned to be completed by the end of 2023
Katerina Belousova

The plant will be able to process 250,000 tons of waste per year

In Lviv, they plan to complete the construction of a waste processing plant by the end of 2023.

So far, 100% of the design and 25% of the construction works have been completed, Lviv Mayor Andriy Sadovyi reported on Facebook.

It is noted that the next stage of the plant's launch will be the installation of equipment.

facebook.com/andriy.sadovyi

"The plant will be able to process 250,000 tons of waste per year. This is the amount of waste that is collected every day in Lviv. If more power is needed, the technology will allow it to be provided," said Sadovy.

facebook.com/andriy.sadovyi

He added that the Polish company Control Process S.A. is building the plant. It has already created a number of similar enterprises, in particular in Olsztyn, Poland, which is as similar as possible to Lviv.

Sadovyi emphasized that a food and garden waste composting station also operates in Lviv. In addition, the reclamation of the Hrybovytsky landfill is 91% complete, and work is ongoing

Earlier, EcoPolitic wrote, that the waste processing plant in Lviv was planned to open on August 10, 2023.

As EcoPolitic previously reported, the first waste processing plant in Ukraine opened in Zhytomyr. At present, the depth of first stage processing reaches 40-45%. In a few months, the plant will reach a processing depth of 80-85%, after the launch of the second stage.

Related
A landfill is being equipped in Lutsk according to modern standards. Video.
A landfill is being equipped in Lutsk according to modern standards. Video.

Waste is compacted at the old landfill sites to organize the accumulated waste as much as possible

Waste recycling plant in Lviv is 65% ready. Video
Waste recycling plant in Lviv is 65% ready. Video

Construction is tentatively planned to be completed by the end of 2024 or the beginning of 2025 

There are plans to build 5 new waste processing plants in Transcarpathia
There are plans to build 5 new waste processing plants in Transcarpathia

They are designed to solve the problem of increased volumes of household waste arising due to the large flow of internal migrants into the region

In Obukhiv, children were given an excursion to a waste sorting plant
In Obukhiv, children were given an excursion to a waste sorting plant

Sorting garbage is not only a matter of convenience, but also of preserving the environment