Solar power plant — latest ecology news
A solar power plant with a capacity of 5 MW is already operating at the enterprise
Ukrgasbank and Bank Lviv may be the first banks participating in the project
SPP will allow to save 250-300 thousand hryvnias on payment of electricity every year
SES helped to support the work of the hospital, despite the fact that the weather was not sunny
The station will produce about 30 GW of energy
This will ensure uninterrupted operation of the school and the shelter in the event of a power outage
The capacity of solar projects waiting to be connected to the grid reached 22.4 GW
Thanks to the eco-farm, 50 new jobs will be created
The first batch of solar panels has already been delivered
In 2023, the plant produced 650 MW of solar panels, which was about 5% of the installed capacity in Germany
73 children attend the kindergarten
About 70 children attend the kindergarten