Nuclear power station — latest ecology news
![Scandalous draft law on construction of KhNPP withdrawn from consideration by Verkhovna Rada](https://ecopolitic.com.ua/wp-content/uploads/2024/06/shutterstock_1806337804-500x333.jpg)
In addition to public opposition, the calculations regarding the completion turned out to be outdated
![Environmentalists oppose completion of Khmelnytsky NPP](https://ecopolitic.com.ua/wp-content/uploads/2024/05/shutterstock_1283489569-500x278.jpg)
This position was supported by 19 public organizations, associations and centers of environmental orientation in an appeal to the country's leadership
![The world commemorates the 38th anniversary of the Chernobyl accident](https://ecopolitic.com.ua/wp-content/uploads/2021/08/shutterstock_1019335255-500x334.jpg)
Currently, the Chernobyl zone has become the largest nature reserve in Ukraine
![A number of important decisions for climate and financial aid were made at COP28](https://ecopolitic.com.ua/wp-content/uploads/2023/12/C5EB661A-12A7-4211-96D2-E4173AFB18AD-500x313.jpeg)
123 countries have signed the Declaration on Climate and Health
![A number of countries have promised to triple the capacity of nuclear energy by 2050](https://ecopolitic.com.ua/wp-content/uploads/2023/11/7F571CB3-1531-4ED5-9CE8-16658168E23C-500x313.jpeg)
Countries recognize the key role of nuclear energy to achieve climate neutrality"
![Green generation provided more than 40% of energy needs in Ukraine](https://ecopolitic.com.ua/wp-content/uploads/2021/08/shutterstock_570200689-500x334.jpg)
In August, 1,848,056.3 MWh of electricity was sold
![Germany will not return to nuclear energy – Scholz](https://ecopolitic.com.ua/wp-content/uploads/2022/07/shutterstock_134491178-500x334.jpg)
It will take 15 years and 15-20 billion euros of investment to build a new nuclear power plant
![MEPs included nuclear energy in green technologies in industry](https://ecopolitic.com.ua/wp-content/uploads/2022/07/shutterstock_656140204-1-500x313.jpg)
All technologies from the list will have accelerated permitting procedures
![Russian occupiers shelled Zaporizhzhia nuclear power plant: power supply restored](https://ecopolitic.com.ua/wp-content/uploads/2021/04/shutterstock_1449359903-500x321.jpg)
This is already the seventh blackout at the ZNPP since the beginning of the occupation
![Ukrainians will be able to monitor the radiation background of the Zaporizhia NPP online](https://ecopolitic.com.ua/wp-content/uploads/2023/05/E609DD1D-399F-4147-9C52-793A40347A95-500x313.jpeg)
The data is updated once a day
![Chronicles of the accident at the Chernobyl nuclear power plant: myths and facts about the Chernobyl disaster](https://ecopolitic.com.ua/wp-content/uploads/2023/04/Fotoram.io-15-500x271.jpg)
The designers of the reactor hid the shortcomings of the structures
![The G7 will replace Russian nuclear fuel with its own and renewable energy](https://ecopolitic.com.ua/wp-content/uploads/2022/07/shutterstock_656140204-1-500x313.jpg)
The G7 members agreed to accelerate the phase-out of fossil fuels