Green energy

Each solar panel has a power of 380 watts

In two months, the SPP generated 6.6 MW of electricity

In 2023, wind and solar power plants generated 10% of all energy

The community will receive 3% of the income from the sale of electricity, i.e. 1.5 million hryvnias per year from the operation of one turbine

556.4 MW of green generation capacities are connected to networks in the Odesa region

The company invested UAH 1.5 million in SPP

"Naftogaz" has already launched two solar power plants with a total capacity of more than 34 MW

In 2024, the project is not planned to continue due to limited funding

The financial effect for the city during the operation of the SPP will reach 10 million hryvnias

Initially, local Telegram channels suggested that the wind turbine had been knocked down by a gust of wind

The first results of the project are expected in the first half of 2024

The largest number of capacities was connected in the Odesa region – 65.9 MW