A European standard for monitoring waste treatment facilities has appeared in Ukraine

A European standard for monitoring waste treatment facilities has appeared in Ukraine
Katerina Belousova

A permit for waste treatment will be issued subject to a monitoring program

The Cabinet of Ministers approved the procedure for monitoring waste treatment facilities, which Ukrainian enterprises will carry out by analogy with European ones.

This will help companies identify and reduce the environmental impact of their waste treatment facilities, the Department of Environmental Protection and Natural Resources said on Facebook.

It is noted that entrepreneurs will measure a number of state indicators:

  • air;
  • underground and surface waters;
  • soil;
  • noise pollution, etc.

The collected information will be provided to the state for management decisions.

The message emphasized that this procedure is part of the requirements of the reform of the waste management system. It complies with the provisions of three European directives:

  • 2008/98/EC of November 19, 2008 on waste;
  • 1999/31/EC of April 26, 1999 on waste disposal;
  • 2010/75/EU of November 24, 2010 on industrial emissions (integrated approach to pollution prevention and control).

"European enterprises have the same approaches to the organization of environmental management. At the same time, EU countries use environmental monitoring and control as an administrative tool. Periodic inspection checks are applied to the enterprise. At the same time, registration data from the Environmental Management and Audit System (EMAS) are also being analyzed," Yevgenia Popovych, Director of the Department of Digital Transformation, Electronic Public Services and Waste Management of the Ministry of the Environment, said.

It is noted that in the EU operators of waste treatment facilities carry out monitoring either continuously (using an automated measurement system) or periodically (at certain intervals using manual or automated methods). Monitoring plans are part of the permit requirements.

Popovych emphasized that in Ukraine, a permit to carry out waste processing operations will also be issued on the condition that there is an approved monitoring program. Entrepreneurs will develop such programs every year and submit them to the Ministry of Environment for approval. They should take into account the type, composition and properties of the waste to be treated at the respective installation, etc.

Earlier, EcoPolitic wrote, that the Ministry of Environmental Protection and Natural Resources has launched a beta version of the waste management information system.

Previously, EcoPolitic analyzed at which stages of development are the legislative norms necessary to overcome the accumulation of garbage.

Related
The Cabinet of Ministers has approved a mechanism for recording and identifying waste with an unidentified owner
The Cabinet of Ministers has approved a mechanism for recording and identifying waste with an unidentified owner

The authorities hope that this will reduce the number of unauthorised rubbish dumps in local communities

Zero Waste: practical steps towards a philosophy of sensible consumption that saves the planet
Zero Waste: practical steps towards a philosophy of sensible consumption that saves the planet

The main thing is to shop sensibly, make the most of what you buy, and then recycle it

Fire at a landfill site in Kryvyi Rih: the city has been plagued by the stench for four days
Fire at a landfill site in Kryvyi Rih: the city has been plagued by the stench for four days

Local air pollution levels were more than twice the limit